Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Nov 13, 2020     20-5 Bottom wing skin steps 1-9 (RIGHT) - (8 hours) Category: Wings
Prepared J-channel, clecoed skin, final drilled #40 and #19 for the screws. Dimpled all the skins and J-channel. Countersunk the spar using the jigs prepared.
One hole has been ruined and will require an OOPS rivet.
Decided not to implement the step 8 (modification of the lap joint) neither on the left nor on the right wing. risk to ruin is to high compared to benefit. Unclear to me if the lap joint has been modified on the top wing skins.
UPLOAD pictures
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.